| EUROPEAN
COMMISSION PROJECTS |
NUCLEARMONTAJ
is a founding member of ROMATOM -The Romanian Atomic
Forum holding the president position until 2003. Due to this
position one of the most important aspect of our activity is
the participation, as romanian subcontractor for PHARE and European
Commission projects in the nuclear field.
|
|
PHARE
PROJECT PH4.01/94
|
Regional
Study of Soviet Designed Research Reactors, a 12 months
project (1996-1997) having as contractors AEA Technology
(UK) and INITEC (Spain).
|
|
PHARE
PH4.10/94
|
Technical
Basis and Methodological Approach for Waste Acceptance Criteria,
an 18 months project (1998-1999) having as contractors AEA
Technology (UK) and BELGATOM (Belgium).
|
|
European
Commission project
|
The
Preliminary Evaluation of Spent Fuel Storage at the Magurele
Research Reactor- Romania was a 4 months European Commission
project in 1999 having AEA Technology (UK) as main contractor.
|
|
European
Commission project
|
Management
of Spent Sealed Radioactive Sources in Bulgaria, Latvia, Lithuania,
Romania, and Slovakia a s6 months European Commission project
in 2000 having AEA Technology (UK) as main contractor.
|